Compliance findings

What this project still needs on file, and the issues someone should look at.

Project
1–15 of 49

Documents this project is missing 68

Upload or generate these and they tick off automatically — new project documents are checked as they arrive.

Issues to review 49

Problems found on this project's own documents and outputs — each one needs a person to look.

FindingAssigneeOpenedResult
Site Inspection Checklists is overdue for its cycle.—17d agoContradicted
VO-118 Evidence Pack does not reference the site document register.—16d agoContradicted
Toolbox talk records missing for week 29.—15d agoTo add
Crane lift plan references superseded drawing S-201 Rev B.—14d agoContradicted
Level 15 slab pour ITP is missing the engineer's hold-point sign-off.—12d agoContradicted
Scaffold inspection tag register not updated since 2 July.—9d agoTo add
Waste docket totals do not match the monthly waste register.—6d agoContradicted